CIPP Pipe Lining
Cure a new pipe wall inside the existing lateral. Most New Westminster jobs work from a cleanout or one small access pit, not a trench across the lawn.
Restore the lateral from a cleanout or small access when the host pipe can support a liner.
Cured-in-place pipe lining (CIPP) builds a continuous new wall inside a damaged sewer lateral. A resin-saturated liner is inverted or pulled into place and cured, sealing cracks, joints, and many root intrusions. On finished New Westminster lots, lining often avoids opening the full surface path. Camera inspection confirms whether the host pipe can support a liner before anyone digs.
Full details, process, and FAQs →